Members Can Post Anonymously On This Site
Building a Community of Practice
-
Similar Topics
-
By NASA
As the agency continues to explore for the benefit of all, NASA is in the process of searching for a new headquarters facility in Washington or the immediate surrounding area.
The current NASA Headquarters lease expires in August 2028, and the agency already has evaluated multiple options including leasing or purchasing within the District of Columbia. Through a request for information published Thursday, NASA took a small step in a longer process to determine the best outcome for the agency and U.S. taxpayers.
“With a new facility on the horizon, NASA has a unique opportunity to better meet the needs of a new generation of explorers, discoverers, and public servants – the Artemis Generation,” said Bob Gibbs, associate administrator, Mission Support Directorate. “The next NASA Headquarters will reflect our journey in a facility that inspires and engages the public, aligns with new ways of working, fosters innovation and connection, and maximizes taxpayer funding.”
NASA is asking for responses from members of the development community, local and state jurisdictions, academia, other federal agencies, commercial aerospace partners, and other interested parties to help inform its decision.
Needs for a new headquarters includes approximately 375,000 to 525,000 square feet of office space to house NASA’s workforce. The desired location is within walking distance to a Washington Metropolitan Area Transit Authority station. In addition, the new location also needs parking options, as well as convenient access to food establishments.
Other ideal characteristics for a new setting include the capability to renovate the space to create a dynamic, flexible, and adaptive work environment inclusive of open work areas, enclosed offices, open collaboration areas, teaming rooms, conference rooms, sensitive compartmented information facilities, and secured storage spaces, to include potential stakeholder meeting, Science, Technology, Engineering, and Mathematics (STEM) educational outreach, and storage spaces.
Responses to the request for information are due no later than 12 p.m. EST on Jan. 15, 2025. This call for ideas is for informational purposes only and is intended to assist NASA with its planning and strategic decisions regarding a future facility. It is not a request for a lease proposal or a solicitation for a contract or other agreement, and it does not obligate NASA in any way.
Under the leadership of the administrator, NASA Headquarters provides overall guidance and direction to the agency, through 10-field centers and a variety of installations nationwide.
To learn more about NASA and its missions, visit:
https://www.nasa.gov
Share
Details
Last Updated Nov 14, 2024 LocationNASA Headquarters Related Terms
NASA Headquarters NASA Centers & Facilities View the full article
-
By NASA
4 min read
Preparations for Next Moonwalk Simulations Underway (and Underwater)
Coastal locations, such as Drakes Bay on the Point Reyes peninsula in Northern California, are increasingly vulnerable to sea level rise.NOAA/NMFS/WCR/CCO The information will help people who live in coastal areas prepare for impacts caused by rising sea levels.
Earth’s ocean is rising, disrupting livelihoods and infrastructure in coastal communities around the world. Agencies and organizations are working to prepare people as their world changes around them, and NASA information is helping these efforts.
The agency’s global data is now available in the sea level section of the Earth Information Center. NASA developed the global sea level change website in collaboration with the U.S. Department of Defense, the World Bank, the U.S. Department of State, and the United Nations Development Programme.
The site includes information on projected sea level rise through the year 2150 for coastlines around the world, as well as estimates of how much flooding a coastal community or region can expect to see in the next 30 years. The projections come from data collected by NASA and its partners and from computer models of ice sheets and the ocean, as well as the latest sea level assessment from the Intergovernmental Panel on Climate Change, and other sources.
“NASA innovates for the benefit of humanity. Our cutting-edge instruments and data-driven information tools help communities and organizations respond to natural hazards and extreme weather, and inform critical coastal infrastructure planning decisions,” said Karen St. Germain, director of the Earth science division at NASA Headquarters in Washington.
Information to Action
International organizations such as the World Bank will use the data from the global sea level change site for tasks including the creation of Climate Risk Profiles for countries especially vulnerable to sea level rise.
The Defense Department will continue to incorporate sea level rise data into its plans to anticipate and respond to hazards posed to its facilities by the effects of rising oceans. Similarly, the State Department uses the information for activities ranging from disaster preparedness to long-term adaptation planning to supporting partners around the world in related efforts.
“We are at a moment of truth in our fight against the climate crisis. The science is unequivocal and must serve as the bedrock upon which decision-making is built. With many communities around the world already facing severe impacts from sea-level rise, this new resource provides a vital tool to help them protect lives and livelihoods. It also illustrates what is at stake between a 1.5-degree-Celsius world and a current-policies trajectory for all coastal communities worldwide,” said Assistant Secretary-General Selwin Hart, special adviser to the United Nations secretary-general on climate action and just transition.
Rising Faster
NASA-led data analyses have revealed that between 1970 and 2023, 96% of countries with coastlines have experienced sea level rise. The rate of that global rise has also accelerated, more than doubling from 0.08 inches (0.21 centimeters) per year in 1993 to about 0.18 inches (0.45 centimeters) per year in 2023.
As the rate of sea level rise increases, millions of people could face the related effects sooner than previously projected, including larger storm surges, more saltwater intrusion into groundwater, and additional high-tide flood days — also known as nuisance floods or sunny day floods.
“This new platform shows the timing of future floods and the magnitude of rising waters in all coastal countries worldwide, connecting science and physics to impacts on people’s livelihoods and safety,” said Nadya Vinogradova Shiffer, director of the ocean physics program at NASA Headquarters in Washington.
Data released earlier this year found that Pacific Island nations will experience at least 6 inches (15 centimeters) of sea level rise in the next 30 years. The number of high-tide flood days will increase by an order of magnitude for nearly all Pacific Island nations by the 2050s.
“The data is clear: Sea levels are rising around the world, and they’re rising faster and faster,” said Ben Hamlington, a sea level researcher at NASA’s Jet Propulsion Laboratory in Southern California and head of the agency’s sea level change science team. “Having the best information to make decisions about how to plan for rising seas is more crucial than ever.”
To explore the global sea level change site:
https://earth.gov/sealevel
News Media Contacts
Karen Fox / Elizabeth Vlock
NASA Headquarters, Washington
202-358-1600
karen.c.fox@nasa.gov / elizabeth.a.vlock@nasa.gov
Jane J. Lee / Andrew Wang
Jet Propulsion Laboratory, Pasadena, Calif.
818-354-0307 / 626-379-6874
jane.j.lee@jpl.nasa.gov / andrew.wang@jpl.nasa.gov
2024-158
Share
Details
Last Updated Nov 13, 2024 Related Terms
Oceans Climate Change Earth Jet Propulsion Laboratory Natural Disasters Explore More
5 min read JPL Workforce Update
Article 17 hours ago 6 min read Inia Soto Ramos, From the Mountains of Puerto Rico to Mountains of NASA Earth Data
Dr. Inia Soto Ramos became fascinated by the mysteries of the ocean while growing up…
Article 22 hours ago 4 min read NASA-developed Technology Supports Ocean Wind Speed Measurements from Commercial Satellite
A science antenna developed with support from NASA’s Earth Science Technology Office (ESTO) is now…
Article 1 day ago Keep Exploring Discover Related Topics
Missions
Humans in Space
Climate Change
Solar System
View the full article
-
By Space Force
The trip consisted of engagements with senior leaders in Belgium, Sweden, Lithuania, Latvia, Finland, Estonia and Poland to reinforce the indispensable alliances that ensure security in the region.
View the full article
-
By NASA
NASA is preparing space at the agency’s Kennedy Space Center in Florida for upcoming assembly activities of the SLS (Space Launch System) rocket core stage for future Artemis missions, beginning with Artemis III.
Teams are currently outfitting the assembly building’s High Bay 2 for future vertical assembly of the rocket stage that will help power NASA’s Artemis campaign to the Moon. During Apollo, High Bay 2, one of four high bays inside the Vehicle Assembly Building, was used to stack the Saturn V rocket. During the Space Shuttle Program, the high bay was used for external tank checkout and storage and as a contingency storage area for the shuttle.
Technicians are building tooling in High Bay 2 at NASA Kennedy that will allow NASA and Boeing, the SLS core stage lead contractor, to vertically integrate the core stage. NASA Michigan-based Futuramic is constructing the tooling that will hold the core stage in a vertical position, allowing NASA and Boeing, the SLS core stage lead contractor, to integrate the SLS rocket’s engine section and four RS-25 engines to finish assembly of the rocket stage. Vertical integration will streamline final production efforts, offering technicians 360-degree access to the stage both internally and externally.
“The High Bay 2 area at NASA Kennedy is critical for work as SLS transitions from a developmental to operational model,” said Chad Bryant, deputy manager of the SLS Stages Office. “While teams are stacking and preparing the SLS rocket for launch of one Artemis mission, the SLS core stage for another Artemis mission will be taking shape just across the aisleway.”
Under the new assembly model beginning with Artemis III, all the major structures for the SLS core stage will continue to be fully produced and manufactured at NASA’s Michoud Assembly Facility in New Orleans. Upon completion of manufacturing and thermal protection system application, the engine section will be shipped to NASA Kennedy for final outfitting. Later, the top sections of the core stage – the forward skirt, intertank, liquid oxygen tank, and liquid hydrogen tank – will be outfitted and joined at NASA Michoud and shipped to NASA Kennedy for final assembly.
The fully assembled core stage for Artemis II arrived at Kennedy on July 23. NASA’s Pegasus barge delivered the SLS engine section for Artemis III to Kennedy in December 2022. Teams at NASA Michoud are outfitting the remaining core stage elements and preparing to horizontally join them. The four RS-25 engines for the Artemis III mission are complete at NASA’s Stennis Space Center in Bay St. Louis, Mississippi, and will be transported to NASA Kennedy in 2025. Major core stage and exploration upper stage structures are in work at NASA Michoud for Artemis IV and beyond.
NASA is working to land the first woman, first person of color, and its first international partner astronaut on the Moon under Artemis. SLS is part of NASA’s backbone for deep space exploration, along with the Orion spacecraft, supporting ground systems, advanced spacesuits and rovers, the Gateway in orbit around the Moon, and commercial human landing systems. SLS is the only rocket that can send Orion, astronauts, and supplies to the Moon in a single launch.
News Media Contact
Jonathan Deal
Marshall Space Flight Center
Huntsville, Ala.
256-544-0034
View the full article
-
By NASA
1 min read
Preparations for Next Moonwalk Simulations Underway (and Underwater)
A NASA logo-themed cake serves as a centerpiece for the event. Credit: NASA/Jef Janis Over 4,300 visitors joined in the fun to commemorate the 65th birthday of NASA’s iconic logo on July 15 at Great Lakes Science Center (GLSC) in downtown Cleveland.
The birthday celebration featured a cake-cutting ceremony and special NASA activities throughout the day, including presentations from NASA’s Glenn Research Center photographers and videographers, a talk from a NASA librarian on the history of the logo, photo opportunities with Glenn’s Eva the Astronaut mascot, a coloring contest, a performance by the NASA Glenn Band, live science shows, and more.
Three of NASA Glenn Research Center’s photographers and videographers talk about their careers and the intersection of art and science. Credit: NASA/Steven Logan
The iconic symbol, known affectionately as “the meatball,” was developed at NASA’s Lewis Research Center in Cleveland (now called NASA Glenn). Employee James Modarelli, who started his career at the center as an artist and technical illustrator, was its chief designer.
Left to right: James Modarelli III, Vice President of STEM Learning at GLSC Scott Vollmer, James Modarelli IV, and NASA Glenn Deputy Center Director Dawn Schaible participate in a cake-cutting ceremony. Credit: NASA/Jef Janis NASA Glenn Deputy Center Director Dawn Schaible, GLSC Vice President of STEM Learning Scott Vollmer, and members of the Modarelli family cut the special NASA logo-themed cake. Participants explored the many activities and presentations honoring the history and significance of NASA’s logo.
Return to Newsletter Explore More
2 min read Automated Technology Developed at Glenn Launches to Space
Article 4 mins ago 1 min read Cleveland High School Students Land STEM Career Exploration Experience
Article 5 mins ago 1 min read NASA Lands at National Cherry Festival
Article 5 mins ago View the full article
-
-
Check out these Videos
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.